The technology E20 eVTOL has completed the airframe strength test.

On March 19, Jinshi Data reported that Times Technology announced that the E20 eVTOL would complete its airframe strength test in March 2025. This test was conducted strictly in accordance with airworthiness requirements and aimed to verify whether the stiffness and strength of the E20 eVTOL’s wings, tail, and rear fuselage structure meet design specifications. The test results indicated that the structural design of the E20 eVTOL meets standards for safety and reliability. Times Technology stated that the test data will lay a solid foundation for the crewed flight test of the E20 eVTOL in 2025.

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
0/400
No comments
Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
English
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)